Services
Gravel Driveway Installation in Alachua, FL
A gravel driveway looks simple until the first wet summer. Then the sand ruts, the crown flattens, water runs down the middle, and the culvert washes out. North Florida Land Improvements LLC treats every gravel driveway as a small road, with a graded subgrade, a crown that sheds water, proper drainage and stone that stays where it is put. We install new drives, regravel worn ones, and set culvert pipe where a drive crosses a roadside ditch. Whether your property fronts a county road near High Springs or sits at the end of a long rural drive in Union County, call (352) 756-0010 for a free estimate and we will walk the route with you.
The scope
What Driveway Installation Actually Involves
Driveway installation is the construction of a stable, drained surface from the road to your home, shop or barn. The work starts with staking the centerline and width, then clearing and stripping the organic topsoil so stone rests on firm ground. The subgrade is graded with a crown or cross-slope so water runs off the sides, and ditches or swales carry it away, with a culvert where the drive crosses a roadside ditch. Soft or wet spots may get geotextile fabric to keep the stone and soil from mixing. Base stone goes down in lifts and is compacted, followed by a surface course of stone with enough fine material to bind. In Florida that base is often limerock, which is crushed limestone, or clean crushed stone such as #57, chosen for traffic, soil and drainage. Regraveling means re-cutting the crown, repairing washouts and adding fresh surface stone. Before, you have ruts, puddles and a drive that gets worse every summer. After, you have a firm, crowned drive that drains and holds its shape.
Why us
Why Alachua Property Owners Choose North Florida Land Improvements
We are a family-owned business that clears, grades and builds drives with its own equipment, so the crew that shapes your subgrade is the crew that finishes it. Eric Temme bought an established company and its equipment in 2022, and he brings in experienced operators for longer drives. We have installed driveways and culvert pipe since taking over the business.
Drainage is where most gravel drives fail, so that is where we spend our attention. Penn State's research on crown and cross-slope shows that standing water softens the base and flat crowns cause ponding and erosion, and it is why we crown every drive. We also check the Alachua County driveway connection application requirements before work starts, so your connection permit is settled before the first stone arrives.
Read more about our family and how we work, and ask for an estimate.
Step by step
Our Driveway Installation Process
Stake the Route and Check the Connection Permit
We stake the centerline and width with you, then check the road connection. Connections to county roads need a right-of-way permit from Alachua County Public Works, and a driveway on a state road needs an FDOT connection permit under Rule 14-96 before it is built or altered. Confirming which agency controls your road, and whether you are in the City of Alachua or the county, comes before we move any dirt.
Clear, Strip and Grade the Subgrade
We clear the corridor, strip roots and topsoil, and grade the subgrade with a crown or cross-slope. Penn State's Center for Dirt and Gravel Road Studies recommends a 4 to 6 percent cross-slope, about one-half to three-quarters of an inch of fall per foot of width, for unpaved roads. That crown is what makes a gravel drive shed water and stay firm through the wet season.
Set Culverts and Drainage
Where the drive crosses a roadside ditch, we set the culvert pipe on bedded, compacted material at the ditch flowline with cover over the top. Pipe ends are protected so water does not undercut them. Pipe size depends on the ditch and the jurisdiction, so we confirm the requirement with the county before we order pipe.
Build the Base and Compact It
Base stone is spread in lifts and compacted with a roller or plate compactor, and fabric goes under it where the subgrade is soft or wet. Sand carries load poorly on its own, so the base does the structural work. Compacted stone is denser than it looks going down, so we account for that when we order material.
Place the Surface Course and Finish
The surface course goes on next, is shaped to the crown, and is dressed at the edges so water leaves the drive instead of running down the middle. A surface with some fine material binds and resists washboarding better than clean stone alone. You receive a firm, crowned gravel driveway that drains and is ready to drive on, with the drainage points shown to you at the final walk.
On the job
Brush out, ground open, drive in
Straight from the cab: clearing a lot with the grapple, and a new gravel driveway set over its culvert at the roadside ditch.
Where we work
Serving Alachua and the surrounding counties
North Florida Land Improvements LLC driveway crews work throughout Alachua County, including Alachua, High Springs, Newberry and Archer, and in Union, Bradford, Columbia, Suwannee and Levy Counties. We build long rural drives off county roads near Lake Butler, Starke, Lake City, Live Oak and Williston, and we regravel drives that have worn thin along SR-235, US-301 and US-129. Larger jobs take us farther from home.
Driveways here fight sandy soil and summer water. Sand drains but does not carry weight, so the base must do the load-bearing work, and heavy storms can wash out any drive that lacks a crown or a culvert. The Santa Fe River corridor and low ground near Paynes Prairie hold water, and rural roads in Bradford and Union Counties often have roadside ditches that make culvert placement part of the job. We build the crown and drainage to handle a Florida wet season, not just a dry week.
From our job sites
Recent jobs

Wooded lot cleared to the tree line 
Open ground, good oak kept 
Trees out, roots and all 
Lot finished edge to edge
Common questions
Driveway Installation FAQs
How much gravel do I need for a driveway?
Multiply length, width and depth to get volume, then convert to tons. As a rule of thumb from suppliers, #57 stone covers about 100 square feet per ton at 2 inches deep. Loose stone also compacts, so order more than the flat math suggests. We measure the route and calculate the material for you.
What is the best gravel for a driveway in Florida?
Common choices are limerock or crushed limestone base, #57 crushed stone, and recycled concrete or asphalt millings. The best one depends on your soil, the traffic and the drainage. A base of limerock with a surface course that includes fines tends to bind well.
How thick should a gravel driveway be?
General guidance for a two-vehicle residential drive on typical soil is roughly 9 to 13 inches of compacted stone in total, with less needed on firm sandy ground and more for heavy vehicles. That guidance comes from northern suppliers.
How long does a gravel driveway last?
It depends on the base, drainage and traffic. Surface stone thins and the crown flattens with use, so periodic regrading and topping up keep a drive sound. A drive with a proper base, a crown and working drainage lasts far longer than one without.
Do I need a culvert for my driveway?
If the drive crosses a roadside ditch or swale, water needs a path under it. Pipe size depends on the ditch and the jurisdiction, and minimums vary from county to county. We check before we order pipe.
Do I need a permit to build a driveway in Alachua County?
Connections to a county road require a right-of-way connection permit from Alachua County Public Works. State roads require an FDOT connection permit under Rule 14-96, Florida Administrative Code. Confirm the agency, and whether you are in city or county jurisdiction, before you start.
Keep exploring
Related services
A good drive often starts with clearing the corridor and ends with the right grade. See our land clearing service for the corridor, or land grading for drainage and finish work. To plan your drive, contact us or call (352) 756-0010 for a free estimate.

Land Clearing
We remove brush, trees and undergrowth so you can build, farm or reclaim your property, from a single homesite to many acres.
Learn more
Site Preparation
We clear, scrape, grade and laser level your lot so your builder starts on solid, accurate ground.
Learn moreForestry Mulching
One-pass clearing that grinds trees and brush into mulch where they stand, with no burn piles and less soil disturbance.
Learn moreHouse Pads
Level, laser-graded building pads that give your builder or concrete crew a stable surface to work from.
Learn more

Free estimates
Ready to talk about driveways and culverts?
Call (352) 756-0010 or request your free estimate, and we will walk the property with you before anything is quoted.
Military and first responder discounts available.
